B268 Replace STUS Backup Generator
The contractor must provide all plant, labor, equipment, transportation, and tools to fully replace a 30 kW backup generator, fuel tank, fuel pump, and automatic transfer switch serving Simulator Training Facility B268 at Columbus AFB, including a new connection to the base EMCS. The estimated budget range is $100,000 to $250,000. A site visit is scheduled for 13 Aug 2026 at 9:00 AM CST, with registration required by 7:30 AM CST on 05 Aug 2026. Contractors must complete CUI training and return a signed MFR acknowledgment to access drawings and controlled documents. Funds are not currently available, and the government’