Inactive
Notice ID:FA3022-22-Q-0315
In accordance to the Statement of Work, the contractor shall provide, at a minimum, all equipment, installation, training, on-site performance and system testing, complete documentation (including pro...
In accordance to the Statement of Work, the contractor shall provide, at a minimum, all equipment, installation, training, on-site performance and system testing, complete documentation (including product assembly drawings, operation manuals and wiring diagrams), in both hard copy and electronic format, with enough detail to support the training of maintenance personnel and support troubleshooting, preventive maintenance, and corrective maintenance. Additionally, the documentation provided shall describe in great detail the exact capabilities of the system once installed in order to replace or upgrade the existing Forum Communications Alert II system in use as the Secondary Crash Net (SCN) system