The work consists of all labor, equipment, and materials required to install fourteen (14) 60-amp 3-phase whip from the second panel of the 80-kVA UPS. The installation will require two (2) whips per ...
The work consists of all labor, equipment, and materials required to install fourteen (14) 60-amp 3-phase whip from the second panel of the 80-kVA UPS. The installation will require two (2) whips per cabinet covering a total of seven (7) cabinets. The whips will be pre-assembled off-site at the contractor’s warehouse. All work will be executed in accordance with applicable regulations and standards to meet organizational needs. The scope includes supplying all necessary parts for the project, including but not limited to: • Fourteen (14) Square D QOB360 breakers. • Fourteen (14) 460C9W cord connectors. • 250 ft of 6-4 SOOW cord. • Fourteen (14) cord strain reliefs. • Tie wraps and strapping as needed.