Command Wall and Awards
The government requires turn-key fabrication, delivery, and ancillary installation of custom command wall systems in a shared hallway. This includes two efforts: System 1 (new build) involves installing an architectural laminate slatwall paneling system that matches existing legacy finishes, while System 2 (retrofit) requires removing legacy lettering and a 30” x 30” patch before installing new squadron lettering. A single firm-fixed-price purchase order will be awarded to one vendor capable of fulfilling the entire requirement. Detailed specifications, dimensions, and installation instructions are provided in the attached Salient Characteristics Sheet and visual renderings. An amendment added technical clarification via a question-and-answer attachment.