66 ABG/SC Giant Voice RTU Relocation
The contractor must relocate one Giant Voice Remote Terminal Unit from the 3rd floor of building 1108 to a new location, restoring it to Full Operational Capability. The work includes providing all specialized labor, materials, tools, and equipment for safe power-down, transport, re-installation, and re-integration. This involves handling RF cabling, network connections, power configurations, and grounding, plus comprehensive post-move testing. Performance of services is at Hanscom AFB, Massachusetts. A site visit is scheduled for 23 July 2026 at 9:00am EST, with registration required by 20 July 2026.