Inactive
Notice ID:FA283519PA007
**Responses now due by 5pm EST 26 Feb 2019. Digitize Prism Receiving Unit is a Fire Alarm/Reporting System designed to alert firefighters know the whereabouts of fires. The current system in place is ...
**Responses now due by 5pm EST 26 Feb 2019. Digitize Prism Receiving Unit is a Fire Alarm/Reporting System designed to alert firefighters know the whereabouts of fires. The current system in place is over 40 years old and needs replacement with the new Digitizer Prism. Currently the Fire alarm reporting equipment DIGITIZE 3505 is considered obsolete and non-supportable. The upgrade version to the "3505" console is the "PRISM" system. The "PRIM" is designed to replace the "3505" in kind with no console modifications needed. This will allow us to utilize the existing fire alarm circuitry, equipment and components. the Scope : Replace Digitizer • Remove existing 3505 digitizer • Install Digitizer Prism Main Receiving Unit • Install RS-232 System Comfig Card • Install System Alarm Monitoring Card • Install System Options Update Replacement • Install System Software Support • To include all installation, programming and labor General Requirements: Work includes, but not limited to the following: a. Provide resolutions of any technical problems that arise during the construction. b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work. c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates. d. The Contractor is solely responsible for compliance with the Occupational Safety and Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days. e. Complete the "builder data inventory and assessment sheet" for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form f. Provide three (3) copies of O & M manuals and warranty letter g. Period of Performance 60 days after award of contract