Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA282322Q0016
This requirement is for the installation of Lenel Access Control Systems (ACS) at 8 bunkers that ties back into the control center of the existing CAPE facility that already has a Lenel ACS. The locat...
This requirement is for the installation of Lenel Access Control Systems (ACS) at 8 bunkers that ties back into the control center of the existing CAPE facility that already has a Lenel ACS. The location is at the AMTC complex on Eglin main base, AFB, Fl Phase II CAPE bunkers. Contractor will provide all labor and material for the complete installation and integration of Lenel ACSs. A site visit will be be performed on 7 June 2022 at 9 am CST.