FOPR for GLEN 26-1004 CSOF Bollards
FA255026R0050
Schriever SFB requires construction services to renew a section of its south restricted area fencing and operable sliding gates to meet current anti-terrorism and force protection standards. The work includes developing shop drawings and installing concrete-filled bollards along a specified section of the fence line. Performance will take place at Schriever SFB. The total period of performance is 180 days from notice-to-proceed.