Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA255024Q0024
Delta 8 CTS requires the following work for B300, Rooms 242, 243, 246, and 248: · Installation of (2) 2” rigid conduit with sealed fittings. · Installation of approximately 250 feet of 2” x 4” wire ba...
Delta 8 CTS requires the following work for B300, Rooms 242, 243, 246, and 248: · Installation of (2) 2” rigid conduit with sealed fittings. · Installation of approximately 250 feet of 2” x 4” wire basket tray for future workstations. · Installation of ground system to include conveyance, ground bar, and grounding of pathways. · Installation shall be done according to applicable regulations and safety standards. Provide and install a total of (3) wall-mounted cabinets sized 24” High X 24” Wide X 30” Depth. One in Room 243, one in Room 246, one in Room 242. The wall mounted cabinets shall have a fiberoptic LIU, of sufficient capacity to accommodate all backbone cabling. Each cabinet shall be grounded to a ground bar located near each cabinet. · Provide and install firestop material in all Telecommunications conduit sleeves in required areas. · Provide, install, terminate, and test a total of (2) OM4, 6 Strand Multi-Mode Fiber Optic Cables. The first from Room 243 to Room 246, and the second from Room 243 to Room 242. These cables shall be terminated using LC connectors. (Note: All above ceiling cables shall be plenum rated) · Contracted procurement of necessary equipment · Cleanup and trash removal shall be included. Amendment 0001 Questions and Answers have been uploaded. No other changes have been made. Amendment 0002 - 26 July 2024 Revised SOW removing paragrahs 4.1 and 4.2 in reference to modular furniture. See SOW dated 26 July 2024. Revised Questions and Answers correcting the answer to question #12. Offer due date remains unchanged. Amendment 0003 - 29 July 2024 Revised SOW removing paragraphs pertaining to modular furniture. Furniture is not inluded in this soliciattion. See SOW dated 29 July 2024. Offer due date remains unchanged.