Amendment 3: Solicitation- WT 18058173 Airfield and Weather Flight Carpet Replacement
The project involves removing and replacing approximately 4,370 square feet of carpet on the first floor of Building 122 at Peterson Space Force Base. The contractor will coordinate with 21 CES for bio-environmental screening of hazardous materials beneath the existing flooring before removing old carpet and rubber cove base, with daily cleanup and off-base debris disposal; on-site equipment storage is prohibited. The contractor will relocate standard furniture and coordinate with the Government to ensure IT cables, power cords, and personal items are removed beforehand. Installation requires commercial-grade modular carpet tiles or planks over existing vinyl flooring using low-VOC adhesives, plus new vinyl cove base, door-bottom trimming, and wall spackling/painting repairs. The project concludes with furniture repositioning and a final Quality Assurance acceptance inspection by 21 CES Operations Flight personnel.