Inactive
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:FA251724Q0072
This requirement is for the Contractor to repair eroded portions of the drainage channel and the soil erosion on the retention pond located on the south side of Building 3, in accordance with (IAW) th...
This requirement is for the Contractor to repair eroded portions of the drainage channel and the soil erosion on the retention pond located on the south side of Building 3, in accordance with (IAW) the Statement of Work (SOW). The Contractor shall conduct all work IAW the specifications, all applicable codes, and the service requirement drawings and details. Amendment 1: The purpose of this amendment is to post the Questions and Answers with the associated attachments; futhermore, the AF Form 3000 has also been included in this amendment.