Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA251720Q0093
UPDATE: 28 Sep 2020: This contract was awarded to All Type Mechanical Services Inc. in the amount of $37,917.20. Please contact TSgt Jason Burton at jason.burton.5@spaceforce.mil with any questions. -...
UPDATE: 28 Sep 2020: This contract was awarded to All Type Mechanical Services Inc. in the amount of $37,917.20. Please contact TSgt Jason Burton at jason.burton.5@spaceforce.mil with any questions. ------------------------------------------------------------------------------------------------------------------------------------------------------------ UPDATE 3:40pm MST, 22 Sept 2020: This solicitation has been extended until 10:00am MST, 23 Sept 2020 to ensure that enough quotes are received in order to make an award decision. If you have any questions, please contact TSgt Jason Burton at jason.burton.5@spaceforce.mil or Katie Hudiburgh at katie.hudiburgh@spaceforce.mil. ----------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE: 3:30pm 21 Sept 2020 Based on the site visit held on 21 Sept 2020, the Statement of Work has been updated to reflect new informaiton. The new SOW has been updated in the attachments section, changes have been added in bold text. Please reference this new SOW when submitting quotes. If you have any questions, please contact TSgt Jason Burton at jason.burton.5@us.af.mil. ------------------------------------------------------------------------------------------------------------------------------------------------------------ This requirement consists of all labor and materials and work necessary to install two new water storage tanks and make operational at Building 590 at Peterson AFB, CO. The contractor shall remove two existing 350 gallon water storage tanks A.O. Smith model number TJH350A along with any associated piping and fittings. The contractor shall install two new water storage tanks and connect to existing heating water supply and return lines in accordance with the attached Statement of Work. Tanks shall be insulated per requirements of latest version of ASHRAE 90.1. The tanks shall be installed in accordance with (IAW) the manufacturer's installation instructions and shall be tested after completion of work for full operation. The contractor shall repair any pipe insulation damaged from tank installation. Contractor shall verify all dimension for the connections. All work to provide complete and usable systems (electrical, plumbing, etc.) shall be included in the project. The contractor is responsible for the removal and disposal of any leftover material, replaced material, or any material that has been deemed unusable from the job site. The contractor is responsible for the transportation of these materials to dispose of them properly and assumes responsibility when said materials leave the job site. Site Visit Information – A site visit is being held at 10:00 A.M. MST, Monday, 21 Sep 2020 at the Peterson AFB Welcome Center. If interested in attending, e-mail TSgt Jason Burton at jason.burton.5@us.af.mil. Please include how many people will be attending and provide the following information for each visitor: First and last name Driver’s license number & state of issuance Date of birth This information must be received no later than 2:00 P.M. MST, Friday, 18 Sep 2020 to ensure access.