Inactive
8(a) Set-Aside (FAR 19.8)
Notice ID:FA2517-20-R-0006
This synopsis requires services to perform HVAC, CRAC and electrical systems support services 24 hours a day, seven days a week, and 365 days a year in accordance with (IAW) the attached DRAFT Perform...
This synopsis requires services to perform HVAC, CRAC and electrical systems support services 24 hours a day, seven days a week, and 365 days a year in accordance with (IAW) the attached DRAFT Performance Work Statement (PWS). Services include facilities management duties, operation, maintenance, repair, and the test and inspection of equipment to include: HVAC, CRAC systems, electrical distribution systems, Power Distribution Systems (PDS), generators, and solid state uninterrupted power systems (UPS). The contractor will ensure proper inspection and maintenance of primary and ancillary equipment and system functions, including but not limited to production, production control, distribution, pumping, emission control, fuel supply, and plant effluent refrigerants. Contractor will also ensure computer systems and equipment supported and affected by the repairs and/or maintenance will maintain sufficient temperature levels (68-74 degrees Fahrenheit room temperature). This modification to the synopsis is to include a draft solicitation for our upcoming FA2517-20-R-0006 RFP. Plesee note that the Instructions to Offerors and Evaluation Criteria has been moved to the start of the clauses section. Please direct any questions or concerns to Christian Cuevas at christian.cuevas@us.af.mil or by phone at 719-556-8004. This secondary modification dated 13 May 2020 is to notify all vendors that the site visit scheduled for the 19th of May has been postponed. All vendors will have at least a weeks notice from the date the official solicitation for the new site visit date. This modification also inlcudes an Attachment 6 KTR Questions From Synopsis. Please note that there a few questions that have not yet been answered. All remaining questions and concerns will be addressed when the official RFP is released.