AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)

Notice ID:FA2396-27-9CTBD

AFRL seeks to transform the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio into a modern, motivating environment that reinforces the USAF Bombers strategic deterrence mission and heritage. The work includes bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancements using existing space and structures. The entire project must be completed within 90 calendar days of award, with Stage 1 Design Plan at 30 days, Stage 2 Sourcing & Fabrication at 60 days, and Stage 3 Physical Implementation & Closeout at 90 days. On-site physical installation must not exceed 30 calendar days from physical site commencement and must not restrict access to 2nd Floor restroom facilities for more than 30 contiguous minutes. Technical requirements and assessment criteria are provided in the attached AOI documents.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8652 AFRL HQ AFRL/PK
  PSC   Z1JZ MAINTENANCE OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »