FA2204_RFI_TACMOR_System

Notice ID:FA2204_RFI_TACMOR_System

The Air Force Life Cycle Management Center seeks qualified systems integrators for the Tactical Multi-Mission Over-the-Horizon Radar (TACMOR), an MTA Rapid Prototyping effort to field a remotely operated OTHR capability in the Indo-Pacific / USINDOPACOM Area of Responsibility. The integrator would design, develop, produce, install, operate, and sustain the full lifecycle, including a bistatic transmit/receive architecture with geographically separated sites in austere environments. Required solutions include self-sustained power and fuel, physical and electronic security, remote monitoring, secure backhaul, environmental resilience, and integration with a centralized Radar Operations Control Center. The Government will furnish land, MILCON, and prepared transmit/receive sites, and may provide black transport via fiber with SATCOM backup, with cryptographic and backhaul details in a CUI technical data package. Anticipated award is FY2027 with performance through FY2029, and respondents must demonstrate mature technical, industrial-base, software, and workforce capabilities to achieve full integration and system sell-off by 30 September 2029.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA2204 THTR BTTL CNTRL AFLCMC/HBD
  PSC   5840 RADAR EQUIPMENT, EXCEPT AIRBORNE
LOCATION: Not Given
Primary Contact
Ms. Tiffany Hinson
Not Given
Alt Contact
Ms. Kayla Gonsalves
Not Given

Links (0)

Attachments (1)


Data sourced from SAM.gov. View Official Posting »