The urgent action will provide the design, manufacture, test, qualification, integration, and other support necessary to fully integrate the Long Range Standoff (LRSO) Weapon System (WS) Carriage Equi...
The urgent action will provide the design, manufacture, test, qualification, integration, and other support necessary to fully integrate the Long Range Standoff (LRSO) Weapon System (WS) Carriage Equipment for the B-52H bomber platform with the LRSO Cruise Missile. The LRSO Carriage Equipment is required to meet schedule for Developmental Test and Evaluation (DT&E) phase and Aircraft Monitor and Control (AMAC) phase. These phases are necessary to achieve Milestone C and Initial Operating Capability (IOC). Due to schedule challenges, the LRSO program schedule is in a "day for day" slip for conducting EMD flight tests on surrogate carriage equipment that pushes an unacceptable risk into AMAC nuclear certification.