56 CS FOC to Flightline and Wx Equipment, Luke AFB
The requirement is for a contractor to engineer, furnish, install, and test new 12-strand single-mode fiber optic cable connecting RAPCON, ATCT, Base Ops, Command Post, localizer/glide slope, TACAN, GATR, and FMQ-19 locations at Luke AFB, AZ, using new/existing manhole/handhole duct systems and some direct-buried routing. The contractor must provide all new, non-refurbished equipment, tools, materials, supplies, transportation, labor, supervision, and management; materials must be rust-proof and corrosion-resistant, and no government-furnished materials will be provided. Only SBA-certified Women-Owned Small Businesses are eligible. A site visit is scheduled for 4 November 2026 at 0900 Arizona time, with attendance limited to two representatives per contractor and base-access template/ID information due by 26 October 2026 at 1500 Arizona time. Questions are due by COB 22 October 2026 at 1500 Arizona time, finalized Q&A will be posted by 26 October 2026, and responses to site-visit Q&A will be posted by 13 November 2026 at 1300 Arizona time.