Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:F3QCCM0269A002
The Contractor shall provide the necessary materials, parts, labor, travel, and shipping and on-site field measure/drawing to provide the required “new” cryogenic piping materials for the construction...
The Contractor shall provide the necessary materials, parts, labor, travel, and shipping and on-site field measure/drawing to provide the required “new” cryogenic piping materials for the construction of one Vacuum Jacketed (VJ) Liquid Nitrogen (LN2) Piping System. This new Piping system is in support of 402d Electronics Maintenance Group’s (EMXG) new environmental chamber on raceway Y8 of Building 640. The Government shall provide installation for the piping materials. The VJ LN2 piping system shall include necessary project management, piping field measure design work/dimension verification for the piping system drawing. NOTE: The drawing provided is a rough estimate. The PD was also revised to show a change in quantity for Item 2. The correct quantity is now listed for Item 2 at: 4.5 each