435 CTS HVAC
Please see attached documents: 1. SOW AC 20250930
Please see attached documents: 1. SOW AC 20250930
This is a contract for the manufacturing, delivery, and assembly of a complete Remko-brand air conditioning system, including site mobilization, a specified list of components, and a complex refrigerant pipe network. The work involves installation at a maximum height of 3.50 meters, requires brazing by qualified personnel under dry nitrogen, and includes system adjustment, personnel training, and as-built documentation. The contractor must provide a two-week lead time for coordination. No specific budget or location for performance is mentioned in the provided description.