Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:F2B0BB1210AW01
The Contractor shall supply and install systems workstation furniture in accordance with the Statement of Work (SOW) and the layout in Attachment 1. The Contractor must provide the necessary equipment...
The Contractor shall supply and install systems workstation furniture in accordance with the Statement of Work (SOW) and the layout in Attachment 1. The Contractor must provide the necessary equipment, labor and licensed services to install the new furniture power, and data ports manufacture and electrical code specification, NOTE: CAT6 wire runs are provided by base Comm, installation of wire within wire trays, and connection to Data/Comm ports will be completed by contractor. Period of Performance: 60 Days ADC.