Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:F1Y6AA0076AW02
The purpose of this requirement is for the installation of a Movable Wall System in building 341 on FE Warren AFB, Cheyenne WY. The Contractor shall provide all management, labor, materials, and fuel ...
The purpose of this requirement is for the installation of a Movable Wall System in building 341 on FE Warren AFB, Cheyenne WY. The Contractor shall provide all management, labor, materials, and fuel necessary to install a movable track/wall system attached to the ceiling beams, that is capable of forming multiple room layouts (to include hallways) and durable enough to withstand impact from simunitions and battlefield airmen with full body gear. The period of performance for the work to be performed must be completed no later than six (6) months after contract award.