Inactive
Notice ID:F1V3M19178AW01
This requirement is for the purchase of materials to add a 34 foot Tall Structural Steel Framed Elevator Shaft trainer to existing 3-story structural burn training tower south wall(4th floor is roof)....
This requirement is for the purchase of materials to add a 34 foot Tall Structural Steel Framed Elevator Shaft trainer to existing 3-story structural burn training tower south wall(4th floor is roof). - Exterior materials should color match the Air Force Tan existing structural burn facility. - Materials for interior floor of elevator shaft at 9 foot level - Materials for parapet wall on roof of elevator shaft trainer - Materials for 3040 Shutter for entry to existing structural burn facility on 1st & 4th floor - Materials for Cast Iron Manhole Frame/Cover(s) with 34 inch diameter lid, self-seal gasket, and concealed pick point on elevator shaft roof (4th floor) - Materials for 2 foot X 2 foot Curb with Lift-Off cover on 2nd Floor - Matching exterior wall siding size of 6 ΒΌ inches wide and color in Air Force Tan to cover two existing shutters Contractor will be responsible to deliver materials to Ellsworth AFB. Forklift will be provided by requestor to unload materials. This is a sources sought announcement to be used for market analysis in determining the availability of the requirement. This sources sought in no way contractually binds the government. Awards will not be made based on offers received in response to this request.