Contractor will be escorted while on installation; clearance not applicable. Removal and disposal of damaged shelves and bolts from concrete floor. Install of new 30 pallet rack uprights, 16 ft 8in hi...
Contractor will be escorted while on installation; clearance not applicable. Removal and disposal of damaged shelves and bolts from concrete floor. Install of new 30 pallet rack uprights, 16 ft 8in high and 6ft wide with weight capacity of 6,500 lbs each in 4 rows. Widen new shelving aisles from 4ft to 9ft apart, to ensure the Material Handling Equipment (MHE) can safely pass through aisles. Removal and disposal of slurry and outdated 350’ guide wire embedded in concrete between aisles, replace with new wire, and seal with epoxy, wire is used to guide the MHE safely between aisles.