Inactive
Notice ID:F1H3A89281AW05
The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to remove (4) each Existing 351 Protection system relays and install with (4) e...
The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to remove (4) each Existing 351 Protection system relays and install with (4) each new 351 Relays. The fixed relays will be returned to Beale AFB to be used as spares.