EGYN121012E Repair Outdated Electrical Switchgear Study B820-830

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:EGYN121012E

Scope of Work: The Architect-Engineer (A-E) shall conduct an engineering design study, to include a Class 4 cost estimate (accuracy defined as – 20% to +30%) and provide recommendations to upgrade and...