Renovate RM106 For Emergency Operations Center, B730
EEPZ255862
The contractor must provide all resources for a full renovation of an existing alternate Emergency Operation Center (EOC), including security analysis and upgrades to meet UFC and AFI requirements. The primary work involves installing a separate HVAC system, a backup generator, communication equipment, and bathroom lighting. All work must comply with the Statement of Work, AF requirements, and applicable codes. This is a sources sought notice for market research only, with no award to be made from this posting. No budget, performance location, or submission timelines are specified.