The Contractor must provide all plant, labor, equipment, transportation, and tools required to perform the entire replacement of the roof of building 847. Perform all work according to this Statement ...
The Contractor must provide all plant, labor, equipment, transportation, and tools required to perform the entire replacement of the roof of building 847. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references. The new roof shall eliminate each and every weather borne water leak into B847. The work shall include but is not limited to: replacement of standing seam components, insulation, gutter system, roof curbing, fascia, and soffit.