The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full renovation of B454 into the new Wash Rack. Perform all work according to this Statement o...
The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full renovation of B454 into the new Wash Rack. Perform all work according to this Statement of Work (SOW), the 100% Design, 100% Specifications, and all related AF requirements and other codes and references. Construction must be accomplished in accordance with applicable UFC’s, ETL’s, (UFC’s and ETL’s may be found on-line at www.wbdg.org.) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices (Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW.