Inactive
Notice ID:DACA01-5-24-0401
Delineated Area: 10-15 mile radius from Gate 9 of Redstone Arsenal towards Huntsville International Airport. Facility Requirements: Total SqFt: 20,000+ Electrical Service: 800Kw HVAC Capacity: 240+ To...
Delineated Area: 10-15 mile radius from Gate 9 of Redstone Arsenal towards Huntsville International Airport. Facility Requirements: Total SqFt: 20,000+ Electrical Service: 800Kw HVAC Capacity: 240+ Tons Workspace Capacity: 50 – 100 Users (Dev, Test, Int) (more capacity for developers?) Network Capacity: Ability to establish 10G SDREN connection. Support up to 3 cases concurrently (SoS Integration, Test, V&V, etc.) 3 Cases is the threshold; ability to grow and scale beyond 3 cases is an objective requirement. Support up to 60 personnel for Test & integration and V&V & infrastructure O&M Support up to 175 personnel participating in Integrated Development Teams for SW development, systems engineering, test, cyber, etc. This is an "objective" requirement; all others are "threshold" unless otherwise stated. Allow Foreign Nationals to enter the facility, and conduct hands-on system integration & test activities, as well as attend demonstrations and conduct collaborative and informative meetings and briefings. Allow for mixed personnel to collaborate in the same physical workspaces. Allow for designated US-only personnel cleared workspaces. Allow for equipment of US and NON-US origins (i.e indigenous components, sensors, comms, models, emulators, and simulators, etc.) for integration, test, evaluation, and validation. Provide unclassified network services, connected back to IF-IDE hub and SWIF infrastructure. Provide classified network services (Secret collateral, and secret releasable), connected back to IF-IDE hub and SWIF infrastructure. Provide space for 1x full time facility security officer to oversee and manage the industrial security program. 1x FTE based on 3x concurrent cases; security personnel will increase number of concurrent cases/programs and/or selected facility size/layout. Provide space for up to 8x FTE for facility infrastructure and user support. 8x FTE based on 3x concurrent cases; support personnel will increase number of concurrent cases/programs. Provide space for up to 4x FTE for program management and technical oversight personnel. 4x FTE based on 3x concurrent cases; support personnel will increase number of concurrent cases/programs. Case 1 Requirements: Component Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable System Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable Test Line Requirements: Electrical:110v/120v standard quad 10A/15A receptacles HVAC:10 Ton SqFt:1500+ Misc: Seating for up to 12 with desks/workstations/monitors and large wall-mounted displays Physical Security Requirements: Separation from country-specific releasable technology to some NOFORN aspects Physical separation and protection for country-specific program protection hardware resources Ability for FN technicians to operate country-specific program protection hardware during ongoing system integration and component integration activities. Case 2: Component Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable System Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable Test Line Requirements: Electrical:110v/120v standard quad 10A/15A receptacles HVAC:10 Ton SqFt:1500+ Misc: Seating for up to 12 with desks/workstations/monitors and large wall-mounted displays Physical Security Requirements: Separation from country-specific releasable technology to some NOFORN aspects Physical separation and protection for country-specific program protection hardware resources Ability for FN technicians to operate country-specific program protection hardware during ongoing system integration and component integration activities. Case 3: Component Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable System Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable Test Line Requirements: Electrical:110v/120v standard quad 10A/15A receptacles HVAC:10 Ton SqFt:1500+ Misc: Seating for up to 12 with desks/workstations/monitors and large wall-mounted displays Physical Security Requirements: Separation from country-specific releasable technology to some NOFORN aspects Physical separation and protection for country-specific program protection hardware resources Ability for FN technicians to operate country-specific program protection hardware during ongoing system integration and component integration activities.