Inactive
8(a) Set-Aside (FAR 19.8)
Notice ID:Communitor_1
Lift Station located at building 650 requires a new comminutor to replace current inoperable comminutor. Purpose of this piece of equipment is to be the final action of grinding sewage before sending ...
Lift Station located at building 650 requires a new comminutor to replace current inoperable comminutor. Purpose of this piece of equipment is to be the final action of grinding sewage before sending Patrick Space Force Base (PSFB) wastewater to the City of Cocoa. Currently the sewage in grinded by hand by Infrastructure Shop. Work for this task include removing control panels, replacing control panel electrical connections, and installing the new comminutor.