Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:B518_PP_08302022
The Contractor shall operate, maintain, install, refuel, and repair energized and de-energized facility and power distribution components for electric circuits, electric control systems, and associate...
The Contractor shall operate, maintain, install, refuel, and repair energized and de-energized facility and power distribution components for electric circuits, electric control systems, and associated equipment. As needed, the Contractor shall maintain, repair, and replace all electric generating plants, electrical systems, facilities, and spaces. The Contractor shall be responsible for all accountable electrical Real Property Installed Equipment (RPIE), associated equipment items, and all electrical control systems required for RPIE facility electrical systems to be functional. Please review the PWS for further details and email all questions to jon.hoseth@us.af.mil.