Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:A1111111111
In an effort to properly manage the Continuous supply of electricity, Peterson SFB and CMSFS desires to obtain 102 Uninterrupted Power Supply (UPS) . The Contractor shall provide all furnishing necess...
In an effort to properly manage the Continuous supply of electricity, Peterson SFB and CMSFS desires to obtain 102 Uninterrupted Power Supply (UPS) . The Contractor shall provide all furnishing necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to install and complete all work stated in this Statement of Work (SOW). The Contractor shall follow all current, applicable codes, regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by the 21st Civil Engineering Squadron (21st CES) prior to the start of work. The work in this SOW shall be executed by qualified and efficient electricians/tradesmen, skilled in their respective trades. The contractor shall coordinate and perform all operations in a manner that will result in a professionally and expeditiously completed project.