Site Visit - Removal of Old Fluid Cell
The contractor must furnish all tools, parts, materials, equipment, labor, and transportation to decommission, remove, and dispose of one Quintus ABB QFC 1.6 x 4-1400 fluid cell press. Performance is at Building 140, Robins Air Force Base, Georgia. Services include dismantling, rigging, relocating components to a designated on-base cutting site, reducing major components to recyclable sizes, and hauling all scrap and debris off base. Major component weights include an 86,000-lb lower filler piece, a 148,000-lb unwound main cylinder, a 64,000-lb upper filler piece, a 32,000-lb pressure plate, and 7,000 lbs of plating attached to the lower filler. Full details are in the Performance Work Statement.