Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:76071
The Contractor shall provide a reverse osmosis skid, distribution pump skid with duplicate pump, and an ultraviolet light system to kill bacteria in the line. The reverse osmosis skid shall provide, a...
The Contractor shall provide a reverse osmosis skid, distribution pump skid with duplicate pump, and an ultraviolet light system to kill bacteria in the line. The reverse osmosis skid shall provide, at minimum, 9400 gal/day and have no greater than 25 ppm total dissolved solids, as well as a pH range of 5.5-8.0. The reverse osmosis skid shall be arranged IAW the Appendix B.