Notice ID:25P025775
The scope will include the design and construction to include the demolition of all existing fueling systems. Following demolition, the Contractor will be responsible for designing and constructing ne...
The scope will include the design and construction to include the demolition of all existing fueling systems. Following demolition, the Contractor will be responsible for designing and constructing new offloads and fillstands with secondary containment, remote containment basin, required asphalt pavement, a pump shelter with snow shields, fencing, receipt piping and ATG installation.