Inactive
Notice ID:22-ngs-021
Scope - The Naval Foundry and Propeller Center (NFPC) utilizes multiple furnaces in the production process. The two (2) main furnaces, FB-8 and FB-9 also referred to as the 25/50 ton Inductotherm indu...
Scope - The Naval Foundry and Propeller Center (NFPC) utilizes multiple furnaces in the production process. The two (2) main furnaces, FB-8 and FB-9 also referred to as the 25/50 ton Inductotherm induction furnaces, are used during major melting events. The Government requires the two (2) furnaces power supplies to be upgraded. This is a Sole Source requirement. Interested vendors can submit a capability statement with support documentation for verification.