PAO Chiller System
This is a project to construct a dedicated, sound-attenuated mechanical room and an overflow basin for a PAO chiller system. The work includes building walls to specific specifications, installing high-STC-rated doors, and integrating the room with the existing raised access floor and ceiling. The contractor must also provide support stands with containment for the chillers and direct plumbing to a separate overflow drain. If the allocated space is insufficient, the contractor must propose an alternate solution before award. The performance location is not specified, and no budget or non-bid timelines are mentioned.