NIST Boulder Galvanized Steel Stair Installation – Building 2 Mechanical Room
NB194000-26-00857
NIST seeks a qualified small business contractor to remove and replace two existing wooden staircases with new, field-fabricated galvanized steel stair assemblies in the lower-level mechanical room of Building 2 at its Boulder Campus. The work involves demolition, fabrication, on-site welding, and installation, requiring coordination with existing building systems. The new stairs must include specific safety features like slip-resistant treads and compliant handrails. The contractor must adhere to all relevant building codes, OSHA regulations, and NIST safety requirements.