NIST Boulder Solar Lighting Upper Site Replacement
NIST’s Boulder Campus seeks a contractor to replace aging solar-powered exterior pole luminaires with new hard-wired LED pole luminaires across selected campus areas. Work includes demolition of existing solar systems, design and installation of new pole bases and luminaires, structural engineering stamped by a Colorado Professional Engineer, and new electrical circuits from nearby panelboards. Construction involves trenching, backfilling, restoration of landscaped and hardscaped areas, labeling, and coordination of electrical shutdowns, all in compliance with NEC and NIST standards. The site visit is scheduled for July 21, 2026, with an attendance list due July 17, 2026. Performance will occur at the NIST Boulder Campus; no budget amount is specified.
Links (0)
Attachments (18)
Data sourced from SAM.gov.
View Official Posting »