Atomic Layer Deposition (ALD) Batch Reactor

Inactive
Notice ID:1333ND26QNB030533

This amendment clarifies requirements for an ALD batch reactor system to be delivered and operated at NIST. NIST will provide only the vacuum pump; the contractor must supply the ozone destruct and vented precursor cabinet, with utilities limited to power, compressed air, and carrier gas (no chilled water), and connections located about 36 inches away. Delivery is FOB destination at NIST shipping and receiving, with no contractor responsibility for uncrating, rigging, or final placement. NIST will furnish precursors and perform acceptance testing and metrology; the warranty is a minimum of one year after acceptance. The system must support four precursor sources plus ozone simultaneously, can process a single 200mm wafer, and NIST will provide and connect facility utilities, so the contractor is not responsible for external connections or welding.

Department/Ind.Agency Subtier Office
COMMERCE, DEPARTMENT OF NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY DEPT OF COMMERCE NIST
  PSC   SEMICONDUCTOR DEVICES AND ASSOCIATED HARDWARE
LOCATION: Not Given
Primary Contact
Sadaf Afkhami
301-***-3976

Links (0)

Attachments (1)

Document
Size
Access
Updated
FormSF1449.pdf
1.5 MB
Public
Aug 18, 2026


Data sourced from SAM.gov. View Official Posting »

Atomic Layer Deposition (ALD) Batch Reactor

Notice ID:1333ND26QNB030533

Please see attached Form SF1449.

Department/Ind.Agency Subtier Office
COMMERCE, DEPARTMENT OF NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY DEPT OF COMMERCE NIST
  PSC   5961 SEMICONDUCTOR DEVICES AND ASSOCIATED HARDWARE
LOCATION: Not Given
Primary Contact
Sadaf Afkhami
301-***-3976

Links (0)

Attachments (1)

Document
Size
Access
Updated
FormSF1449.pdf
1.5 MB
Public
Aug 18, 2026


Data sourced from SAM.gov. View Official Posting »