NOAA Oscar Sette Crane Support
The NOAA seeks a total small business set-aside, firm fixed-price contract for crane support to remove a dive chamber from NOAA Ship Oscar Elton Sette at Kilo Pier, Pearl Harbor, and place it onto a government-provided lowboy flatbed truck. The work involves providing a crane, operator, and rigging capable of lifting approximately 19,000 lbs (a 20-foot high cube container) with a 50-foot radius and a 20-foot lift height. Performance is scheduled for 4 September 2026, with the crane arriving at 0900-0930 and the lift completed by about 1100, requiring access to Pearl Harbor Military base and coordination with NAVFAC. Evaluation factors include technical acceptability, past performance (at least two references), military installation access/availability, and price. No budget amount is specified in the notice.