Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1333MK24Q0142
One (1) Job - Replace Propulsion Control Peripheral Hardware in kind. Including but not limited to Main blower contactors, vital and non-vital field bus relays and sensors, remote I/O field interface ...
One (1) Job - Replace Propulsion Control Peripheral Hardware in kind. Including but not limited to Main blower contactors, vital and non-vital field bus relays and sensors, remote I/O field interface hardware, primary and secondary circuit protection devices, and field interfaced short circuit protection hardware for the Primary Propulsion Drive chassis 1 and 2. One (1) Job - Up to Three (3) Days Sea Trials for Commissioning To be installed during the FY25 dockside POP - The dockside period for performance (POP) is 2-DEC-24 to 17-JAN-25.