Galveston HVAC Repair/Replacement
1333MF26Q0110
The contractor must provide all labor, supervision, materials, equipment, permits, tools, transportation, and incidentals to install five new ductless mini-split HVAC systems at the NOAA facility in Galveston, Texas (4900 Fort Crockett Boulevard)—four replacing failing systems in the Turtle Hospital/Wet Lab and one new dual-head unit in the Turtle Barn. The base contract has a one-year period of performance from award, with the initial HVAC installation required to be completed by December