Galveston HVAC Repair/Replacement

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1333MF26Q0110

The contractor must provide all labor, supervision, materials, equipment, permits, tools, transportation, and incidentals to install five new ductless mini-split HVAC systems at the NOAA facility in Galveston, Texas (4900 Fort Crockett Boulevard)—four replacing failing systems in the Turtle Hospital/Wet Lab and one new dual-head unit in the Turtle Barn. The base contract has a one-year period of performance from award, with the initial HVAC installation required to be completed by December

Department/Ind.Agency Subtier Office
COMMERCE, DEPARTMENT OF NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION DEPT OF COMMERCE NOAA
  PSC   J041 MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
LOCATION: Not Given
Primary Contact
Suzanne Johnston
Not Given

Links (0)

Attachments (1)


Data sourced from SAM.gov. View Official Posting »