Z--Auxiliary Fuel Tank Removal & Replacements NEXRAD
This opportunity involves commercial construction services to remove and replace auxiliary fuel tanks at two NEXRAD sites in Cedar City and Promontory Point, Utah. The contractor must provide all labor, equipment, and materials, with a period of performance of 120 calendar days after receipt of the notice to proceed. The government will furnish the fuel needed for post-installation testing and will fill the tanks before testing, so contractors should not include fuel costs. Clarifications confirm the tanks are located outside and the monitoring equipment is Pneumercator. A firm-fixed-price purchase order is anticipated on an all-or-none basis with Net 30 payment terms.