Z--Replacing Wall & Roof Insulation at NEXRAD sites
This opportunity is for commercial construction services to replace wall and roof insulation at four NEXRAD radar sites located in Reno, Flagstaff, Elko, and Cedar City. The contractor must provide all labor, equipment, and materials, with an R-19 insulation requirement for both walls and ceilings. The period of performance is 365 calendar days after receipt of the notice to proceed, and sites may be scheduled independently within that timeframe. Access is available for a 24-foot box truck, though roads may require careful navigation, and coordination with NWS personnel is needed for building entry. Closed-cell spray foam is an encouraged equivalent option, and the government will remove movable equipment and allow dumpster placement on-site.