Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12FPC419B0002a
This project materially consists of: Tapping into an existing 36" HDPE irrigation pipeline to add a 10" HPDE junction; placing ~770' LF of 10" HDPE pipeline, including one road crossing with multiple ...
This project materially consists of: Tapping into an existing 36" HDPE irrigation pipeline to add a 10" HPDE junction; placing ~770' LF of 10" HDPE pipeline, including one road crossing with multiple utilities; connecting new 10" HDPE pipeline to existing 10" HDPE pipeline; installing all pipeline appurtenances; and constructing a pumping plant with VFD. All work is to be completed summer/early fall 2019 during the irrigation season. Water in the 36" pipeline will be shut off for the minimum duration possible and work should be planned for an expeditious connection to the supply pipeline. Work period is estimated to be 14-28 days. Completion is required prior to Sep 30, 2019. There is no visit planned at this time. If you need to see the site, Please call and we will arrange to let you see it.