Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:129JGP20Q0127
Please see bottom of this Description, and the Attachments/Links page for updates. Felled hazard tree debris to be moved out of campground areas and transferred to two designated disposal sites. This ...
Please see bottom of this Description, and the Attachments/Links page for updates. Felled hazard tree debris to be moved out of campground areas and transferred to two designated disposal sites. This contract is for removal and piling of material only; the resulting debris piles will be burned by Forest Service personnel at a later date. Contractor Responsibility: The Contractor shall provide all labor, housing, supervision, transportation, tools, equipment, and materials necessary to perform the requirements of the contract. Hampshire Rocks Campground, located off Interstate-80 corridor, latitude/longitude: 39 degrees 18’39.26” N, 120 degrees 29’58.22” W. For Hampshire Rocks Campground, the material will be transferred to an existing burn pile location at White Cloud Campground, located off Highway 20 approximately 29 miles from Hampshire Rocks Campground. North Fork Campground, located off Interstate-80 corridor, latitude/longitude 39 degrees 16’16.56” N, 120 degrees 39’29.89” W. For North Fork campground, the material will be moved a short distance from the campground to a landing about a quarter mile away. Please read the solicitation and attachments in full to obtain an understanding of contract requirements BEFORE submitting questions or a quote to the Contracting Officer. Q&A document posted 8/10/2020 - See Attachments/Links Several new photos and Updated Summary Table that addresses some questions received and clarifies specs for chipping and for final cleanup posted 8/14/2020 - See Attachments/Links Solicitation close date extended to Tuesday, 8/18/2020 at noon - those who have already submitted offers may revise if needed up to the new close date/time.