Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12970224R0024
Phase 2 Q&A Log #2 Supplement: Uploaded 10 March 2025 *This Memorandum applies only to the two offerors proceeding to Phase2 ---------------------------------------------------------------------------...
Phase 2 Q&A Log #2 Supplement: Uploaded 10 March 2025 *This Memorandum applies only to the two offerors proceeding to Phase2 ------------------------------------------------------------------------------- Phase 2 Q&A Log #2 (Corrected): Uploaded 6 March 2025 *This Q&A log and supporting drawings/examples apply only to the two offerors proceeding to Phase2 ------------------------------------------------------------------------------- Solicitation Amendment 0004: Issued 6 March 2025 *This amendment applies only to the two offerors proceeding to Phase2 ------------------------------------------------------------------------------- Phase 2 Q&A Log #2: Uploaded 5 March 2025 *This Q&A log and supporting drawings/examples apply only to the two offerors proceeding to Phase2 ------------------------------------------------------------------------------- Solicitation Amendment 0003: Issued 11 February 2025 *This amendment applies only to the two offerors proceeding to Phase2 ------------------------------------------------------------------------------- The project consists of the design and construction of a new admin buildings to replace other facilities that were lost during the Creek Fire. The project will be delivered through a single award Design-Build Contract. The Design-Build Contractor (DBC) shall provide all labor, materials, supplies, equipment, transportation, geotechnical investigation, construction administration services, ancillary services and other necessary items to complete the Work. The Work includes multi-disciplinary design based upon Forest Service-provided Project Definition Documents and existing designs that will be integrated and evolved into a complete set of construction drawings. Additional deliverables anticipated are a project manual, schedule of values, construction cost estimates, building and site design compliant with all building codes, agency space policies, security requirements, and any additional agency requirements. Upon final approval of the Complete Stamped and Signed Construction Documents, the building and site shall be constructed as designed and specified, according to all applicable laws and requirements.