Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12970223Q0091
Submit RFI's via email to derek.lavey@usda.gov by 1700 MDT 9/4/2023 The Sierra National Forest- Bass Lake Ranger District has the following construction requirements: Repair the parking lot at the Wil...
Submit RFI's via email to derek.lavey@usda.gov by 1700 MDT 9/4/2023 The Sierra National Forest- Bass Lake Ranger District has the following construction requirements: Repair the parking lot at the Willow Creek Trailhead clearing and demolition of the broken asphalt section and removal of stumps, downed trees, and debris, placement and compaction of fill material, grading and pavement of the new asphalt section, installing car stops, and installing riprap at inlet/outlet of an existing culvert; Repair the parking lot at the Recreation Point Group Picnic Site clearing and demolition of the broken asphalt section and removal of stumps, downed trees, and debris, grading and pavement of the new asphalt section, and installing car stop; Restore drainage function at the Forks Campground cleaning out two existing culverts and installing riprap at inlet/outlet; Repair the road section and restore drainage flow at the Spring Cove Campground clearing and demolition of the broken asphalt section and removal of stumps, downed trees, and debris, placement and compaction of fill material, grading and pavement of the new asphalt section, and cleaning out an existing culvert and installing riprap at inlet/outlet; Repair the road and trail sections and restore drainage flow at Dry Gulch Campground clearing and demolition of the broken asphalt sections of the parking lot and trail and removal of stumps, downed trees, and debris, placement and compaction of fill material, grading and pavement of the new asphalt sections at parking lot and trails, installing bulletin board, and cleaning out an existing culvert and installing riprap at inlet/outlet; and implement all other aspects shown on the project plans.