Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12905B22Q0085
***AMENDMENT 1 - The purpose of this amendment is to provide Questions and Answers: See attached SF30. Question 1:What would the Liquidated damages be? Answer: FAR 52.211-12 Liquidated Damages-Constru...
***AMENDMENT 1 - The purpose of this amendment is to provide Questions and Answers: See attached SF30. Question 1:What would the Liquidated damages be? Answer: FAR 52.211-12 Liquidated Damages-Construction is not included in this solicitation. There are no liquidated damages. Question 2: In the Bid Documents we do not see how long we are to hold our pricing. How long from the bid date are we to hold our pricing? Answer: 30 days ### The United States Department of Agriculture (USDA) Agricultural Research Service (ARS) requires that all labor, supervision, tools, and materials be provided to replace four existing Bard A/C units & controls with one new combined variable refrigerant flow (VRF) system, including removing existing equipment, installing new equipment, electrical and control modifications. A site visit is schedule for June 16, 2022 at 9am Pacific Time. See Section L.4 for more informaiton and RSVP instructions. Project Location Pacific West Area (PWA) Southwest Watershed Research 2000 E Allen Road Building 320 Tucson, AZ 85719